OB-Stave production database interface
Reception tests of Stave components
CP visual inspection
Space frame visual inspection
Power Bus inspection
Bias Bus inspection
Filter Board visual inspection
HIC inspection and test
HIC tab+wings cut and inspection
HS
HIC powering test after gluing on CP
HS assembly (mask deposition and HIC gluing)
Soldering/Desoldering (bridges, resistors, fpc extension)
U-arm gluing on HS
Stave assembly
HS gluing on SF
Soldering of capacitors on PB + soldering of FB to PB and BB
PB + BB + Filter Board soldering to Stave
PB + BB folding for Stave
Storage, shipment, reception, rework after shipment
Stave storage and shipment
Stave reception
Stave rework after shipment